While their was not an official announcement of anything new Trek wise from R2 this year, they have given us some hints about what they are thinking about for future releases.
On Sunday, R2 had a survey available so we could 'vote" on what some future projects might be.
First they were asking about interest in a Kickstarter campaign for the 350 K'Tinga and what length folks thought the kits should be either 214m or 349m
also listed was to gauge the interest in a D7 as well
so let R2 know what you think, shoot them an email and let them know what you would like to possible see next
https://www.round2models.com/contact
One last thing, also mentioned was a Galaxy Dreadnaught(All Good Things) and a Nebula. No scale was mentioned, but it was lumped together w/the 1/1000 choices, so their ya go
Possible 350 Projects from Round 2
-
- Can-Do Captain
- Posts: 825
- Joined: Mon Sep 10, 2012 3:45 am
- Location: Limestone, TN
Possible 350 Projects from Round 2
The Fleet(kinda)
http://s1166.photobucket.com/user/ssqui ... t=3&page=1
El Facerbook
https://www.facebook.com/scott.squibb
http://s1166.photobucket.com/user/ssqui ... t=3&page=1
El Facerbook
https://www.facebook.com/scott.squibb
-
- Can-Do Captain
- Posts: 877
- Joined: Tue Apr 22, 2014 11:08 pm
- Location: Adelaide, South Australia
Re: Possible 350 Projects from Round 2
Where did 349 meters come from? I've always believed that it was supposed to be 214 meters.
- Moongrim
- Fatidical Fleet Admiral
- Posts: 4962
- Joined: Tue Mar 12, 2013 9:36 pm
- Location: West of Eugene Oregon.
Re: Possible 350 Projects from Round 2
Ok...
I'll write something further...
once I've had a chance to stop hyperventilating...
I'll write something further...
once I've had a chance to stop hyperventilating...
There are Times, Sir, when men of good Conscience cannot blindly follow orders. You acknowledge their sentience, but ignore their personal liberties and freedoms. Order a man to hand over his child to the state? Not while I"m captain.
- J.L.Picard.
- J.L.Picard.
-
- Can-Do Captain
- Posts: 825
- Joined: Mon Sep 10, 2012 3:45 am
- Location: Limestone, TN
Re: Possible 350 Projects from Round 2
Im not sure....there has always been a couple different numbers floating around out there....i voted 214m as well
The Fleet(kinda)
http://s1166.photobucket.com/user/ssqui ... t=3&page=1
El Facerbook
https://www.facebook.com/scott.squibb
http://s1166.photobucket.com/user/ssqui ... t=3&page=1
El Facerbook
https://www.facebook.com/scott.squibb
-
- Can-Do Captain
- Posts: 825
- Joined: Mon Sep 10, 2012 3:45 am
- Location: Limestone, TN
- Moongrim
- Fatidical Fleet Admiral
- Posts: 4962
- Joined: Tue Mar 12, 2013 9:36 pm
- Location: West of Eugene Oregon.
Re: Possible 350 Projects from Round 2
Responded:
1) Swat Fink
2) D 1:350 K'tinga
3) 349 meters.
4) E 1:1000 Battle Damaged refit w/Drydock
5) D 1:1000 Grissom w/ KBOP
6) A 1:2500 Akira
7) A 1:1000 Enterprise D
8) B Ultra Probe
9) A 22" Eagle with Lab Pod
1) Swat Fink
2) D 1:350 K'tinga
3) 349 meters.
4) E 1:1000 Battle Damaged refit w/Drydock
5) D 1:1000 Grissom w/ KBOP
6) A 1:2500 Akira
7) A 1:1000 Enterprise D
8) B Ultra Probe
9) A 22" Eagle with Lab Pod
There are Times, Sir, when men of good Conscience cannot blindly follow orders. You acknowledge their sentience, but ignore their personal liberties and freedoms. Order a man to hand over his child to the state? Not while I"m captain.
- J.L.Picard.
- J.L.Picard.
- Shaw
- Legendary LT Commander
- Posts: 189
- Joined: Wed Feb 18, 2015 12:24 am
- Location: Twin Cities, MN
- Contact:
Re: Possible 350 Projects from Round 2
Even though the 349m length is WAY off, I hope that one wins! It would mean that Round 2 would produce (at 1/350) one of the largest model kits ever! Approximately 39"x28".
Comparison wise, this is what we're looking at...
And someone had wondered how that compared with the old TMoST Enterprise-Klingon size comparison graphic by Jefferies, so I scaled it to the TOS Enterprise and overlaid it on this version.
If this 39"x28" monster wins, it'll be great to display next to the DeBoer's Enterprise (even if it is at a slightly larger scale than the DeBoer's kit).
On the plus side, the 1/537 kit would become something like 1/875 scale, which is pretty close to 1/1000. They also need to re-label their cadet series K'tinga from 1/2500 to 1/4077.
Comparison wise, this is what we're looking at...
And someone had wondered how that compared with the old TMoST Enterprise-Klingon size comparison graphic by Jefferies, so I scaled it to the TOS Enterprise and overlaid it on this version.
If this 39"x28" monster wins, it'll be great to display next to the DeBoer's Enterprise (even if it is at a slightly larger scale than the DeBoer's kit).
On the plus side, the 1/537 kit would become something like 1/875 scale, which is pretty close to 1/1000. They also need to re-label their cadet series K'tinga from 1/2500 to 1/4077.
- Moongrim
- Fatidical Fleet Admiral
- Posts: 4962
- Joined: Tue Mar 12, 2013 9:36 pm
- Location: West of Eugene Oregon.
Re: Possible 350 Projects from Round 2
Well when it comes to Klingon ships, the Bird of Prey alone- demonstrates that size doesn't matter.
https://www.ex-astris-scientia.org/articles/bop-size.htm
https://www.ex-astris-scientia.org/articles/bop-size.htm
There are Times, Sir, when men of good Conscience cannot blindly follow orders. You acknowledge their sentience, but ignore their personal liberties and freedoms. Order a man to hand over his child to the state? Not while I"m captain.
- J.L.Picard.
- J.L.Picard.
- Shaw
- Legendary LT Commander
- Posts: 189
- Joined: Wed Feb 18, 2015 12:24 am
- Location: Twin Cities, MN
- Contact:
Re: Possible 350 Projects from Round 2
It does when building models, and you voted...Moongrim wrote:... size doesn't matter.
Which is a 39"x28" model.Moongrim wrote:2) D 1:350 K'tinga
3) 349 meters.
You should take the top view of the K'tinga and run it down to your local Kinko's and blow it up to 39"x28" and then consider if that was really the model you were wanting from Round 2. And keep in mind that this model will cost two-three times as much as the TOS Enterprise kit to produce (Jamie doesn't have any idea about any of this yet, but hey, it'll be great to see what happens when he figures it all out!).
- Moongrim
- Fatidical Fleet Admiral
- Posts: 4962
- Joined: Tue Mar 12, 2013 9:36 pm
- Location: West of Eugene Oregon.
Re: Possible 350 Projects from Round 2
I could handle that.
How do I know?
I've got one.
How do I know?
I've got one.
There are Times, Sir, when men of good Conscience cannot blindly follow orders. You acknowledge their sentience, but ignore their personal liberties and freedoms. Order a man to hand over his child to the state? Not while I"m captain.
- J.L.Picard.
- J.L.Picard.